Practical route session 5 · Design against requirements
Target: Design against requirements. Planning estimate: 55–70 min or two blocks.
Print / prior evidence
Use the exact Choose, Test and Improve a Thermal Protector print selections and tasks from Paper session 6; complete the full proposal→reveal cycle.
Prerequisites: preceding collected evidence or the corresponding standalone kit bridge. The Cool-water investigation operational setup must be fully checked before handling.
Demonstration / learner work / collect
Check every requirement, choose a priority, propose a matched test and reassess fictional redesigns.
Next decision / continuation
first follow-up and second follow-up as needed; prepare the Cool-water investigation teacher operational card and instruments before the next session.
No equipment homework or mandatory student internet access. Use the complete Cool-water investigation fallback for learners who do not handle equipment or when equipment is unsuitable; record that the fallback does not show construction or testing.